Magnetic levitation air compressor retrofit project – Phase I achieved approximately 25% energy savings; Phase II energy-saving data is being verified and collected.

020-31800925
info@gzhswts.com
Room 701, No. 1080 Huangpu East Road, Huangpu District, Guangzhou, China
Magnetic levitation air compressor retrofit project – Phase I achieved approximately 25% energy savings; Phase II energy-saving data is being verified and collected.

Water for Injection Distribution System
Beverage Water
Water for Fine Daily Chemical Products
Semiconductor Ultrapure Water
Extract Concentration System
Water Reuse, Waste and Emission Reduction
Plating Bath Carbon Treatment
Precious Metal Recovery & Online Circulating Water
Energy Management Intelligence
Blower Energy-Saving Retrofit
Operation Projects (Wastewater)
Operation Projects (Wastewater & Purified Water)
We build long-term client relationships through reliable engineering, practical solutions, and responsive service.